Office technology problems often begin months before move-in, when internet lead times, cabling paths, floor plans, electrical needs, and vendor responsibilities are still undefined. By the time the furniture arrives, important decisions may be expensive to change.
Use this checklist early—ideally while the lease, design, and construction plans are still active.
Internet service and resilience
Confirm which providers serve the exact address, the construction charges and lead times, where service enters the building, and who is responsible for extending it to the technology space.
- Order service early and document the installation date
- Clarify static IP or special application requirements
- Decide whether a backup connection is justified
- Plan how critical traffic behaves during failover
Cabling, equipment space, and power
Define workstation, phone, printer, access point, camera, television, conference room, and equipment locations before walls close. The network equipment needs appropriate space, ventilation, power, physical protection, and labeling.
- Review floor plans with technology locations marked
- Separate low-voltage scope from electrical scope
- Provide cable pathways and spare capacity
- Use a rack or enclosure sized for organized growth
- Plan battery backup for the systems that need orderly operation
Wi-Fi and network design
Access-point placement should follow the layout, materials, density, and coverage expectations. Plan separate access for staff, guests, cameras, phones, and connected devices as appropriate.
- Avoid treating one centrally placed router as the design
- Consider conference rooms and high-density areas
- Include outdoor, warehouse, or detached spaces when needed
- Document network names, ownership, and management
Users, devices, and cloud services
Create a complete list of employees, roles, computers, phones, shared devices, applications, licenses, printers, and collaboration needs. Decide what moves, what is replaced, and what must be ready before the first employee arrives.
- Stage and test computers before move-in
- Update addresses, emergency information, and vendor records
- Plan account changes and new employees
- Confirm file, email, and application access from the new connection
Phones, meetings, printing, and physical systems
Conference-room audio and video, phone routing, door access, alarms, cameras, music, televisions, scanners, label printers, and multifunction printers often involve separate vendors but share networks and schedules. Assign an owner to coordinate the dependencies.
Cutover and opening support
Create a written sequence for final backups, equipment moves, internet activation, DNS or phone changes, testing, staff communication, vendor availability, and fallback options. Avoid making unrelated changes during the cutover window.
- Test from the employee perspective
- Confirm important inbound and outbound communication
- Verify backups after systems are moved
- Keep old services active until the new environment is proven where practical
A successful office opening is coordinated months before move-in. Plan internet, cabling, space, power, network, users, devices, vendors, and cutover as one connected project.